Scout Headquarters, Benty Lane, Crosspool
| General overview of lower level roof, higher level to be seen on the left, before work commences. | |
| Core samples taken to establish deck construction and condition. | |
| Two storey front elevation of the building. Note edge protection in place. | |
| After roof was stripped and vapour barrier installed, insulation is laid with a perforated layer and high performance underlay above. | |
| Top layer mineral surfaced, SBS Elastomeric cap sheet. (lower level). | |
| higher level. | |
| Higher level looking down onto lower level. | |
| We installed new UPVC soffits and fascia to accomodate the extra insulation required to meet current building regulations. |