Major Roofing Project
![]() |
Arriving on site to set up, scaffolding
well on the way. |
![]() |
The bottom roof had to be spanned to reach the top
roof. |
![]() |
Scaffold spanning lower roof. |
![]() |
Top roof with domed concrete roof lights. |
![]() |
Mastic asphalt with limestone chippings will be stripped
off and replaced with new asphalt and white solar reflective paint. |
![]() |
Top roof |
![]() |
Top roof. |
![]() |
Top roof. |
![]() |
Lower level |
![]() |
Bottom roof. |
Intermediate level |
|
![]() |
Intermediate level offshot. |
![]() |
Stripping off asphalt roof. |
![]() |
Stripping off. |
![]() |
Ready to be cleared off. |
![]() |
Just needs a sweep. |
![]() |
Ready for sheathing felt to be laid. |
![]() |
Detail where pipe penetrates roof slab. |
![]() |
Sheathing felt isolating membrane, laid loose. |
![]() |
First coat of mastic asphalt being laid. |
![]() |
First coat of mastic asphalt being laid. |
![]() |
First coat of mastic asphalt being laid. |
![]() |
First coated. |
![]() |
Top roof asphalted. |
![]() |
Top roof asphalted. |
![]() |
Detail of upstand skirting including internal fillet. |
![]() |
Asphalt is dressed into a chase and repointed with
mortar. |
![]() |
Top roof asphalt complete. |
![]() |
Intermediate roof in progress. |
![]() |
Intermediate roof in progress. |
![]() |
Lower level roof asphalt complete. |
![]() |
On completion, new asphalt coverings have two coats
of white solar reflective paint applied to protect against UV degradation. |
![]() |
Note the difference between the first and second coats
of paint. |
![]() |
Job complete. |
![]() |
Job complete |