The roof deck had obviously failed due
to lack of ventilation in roof void and with humid conditions within
the building |
![]() |
With the old coverings and deck removed this is
what greeted us |
![]() |
All defective timbers were cut out and replaced |
![]() |
Working area was limited |
![]() |
Another view |
![]() |
Tanalised laths are installed to allow ventilation
of roof void |
![]() |
18mm exterior grade plywood is installed as the
new deck |
![]() |
A lot of cooler units had to be temporarily moved
to enable re-roofing works to be carried out |
![]() |
Forming the second coat of the internal angle fillet 1. |
![]() |
2. |
![]() |
3. |
![]() |
Curb detail |
![]() |
Curb and skirting detail |
![]() |
Breather vents have been installed to allow ventilation
of roof void |
![]() |
Cooler units re-installed |
![]() |
Space was limited |
![]() |
Health and safety requires fall prevention, Hallam
Scaffold provides a reliable and economic service |